<form id="9xzr7"><menuitem id="9xzr7"><menuitem id="9xzr7"></menuitem></menuitem></form>
<noframes id="9xzr7"><pre id="9xzr7"></pre>
<meter id="9xzr7"><nobr id="9xzr7"><font id="9xzr7"></font></nobr></meter>
<ol id="9xzr7"><track id="9xzr7"></track></ol>

    <menuitem id="9xzr7"></menuitem>

        <track id="9xzr7"><dfn id="9xzr7"><menuitem id="9xzr7"></menuitem></dfn></track>

          <progress id="9xzr7"></progress>
          <address id="9xzr7"><var id="9xzr7"><mark id="9xzr7"></mark></var></address>
          <address id="9xzr7"><nobr id="9xzr7"><listing id="9xzr7"></listing></nobr></address>

          <address id="9xzr7"></address>
            聯系我們
            聯系人:xx
            轉讓電話:13313028229
            地址:xx
            新聞動態
            現澆混凝土樓地面一次澆筑細節嚴控
            影響混凝土板面質量的因素很多,為確保澆筑效果滿足要求,應嚴控細節施工,全面掃除質量隱患。
            There are many factors affecting the quality of concrete slab. In order to ensure that the casting effect meets the requirements, the detailed construction should be strictly controlled and the hidden quality hazards should be completely eliminated.
            (1)采用兩次復核的方法復查樓層混凝土面標高,一次在鋼筋綁扎前,另一次在混凝土澆筑前。確保兩次標高均滿足要求。
            (1) The elevation of floor concrete is checked twice by means of double checks, once before steel bar binding and once before concrete pouring. Ensure that both elevations meet the requirements.
            (2)結構階段在樓層混凝土澆筑后,上層樓層排架支模過程中的腳手管底部采用木塊或木板鋪墊,以保證成型混凝土層面不被破壞。
            (2) In the structural stage, after concrete pouring, the bottom of scaffolding pipe is paved with wood blocks or boards in the process of supporting formwork of bent frame in the upper floor to ensure that the formed concrete layer is not destroyed.
            (3)支模排架拆模時,樓面上預先鋪設好九夾板進行保護,同時鋼管扣件經人工遞送后進行集中堆放,不允許自由下墜砸壞地面,且堆放處采用九夾板保護。
            (3) Nine splints are laid in advance to protect the floor when the formwork bench is demolished. At the boligang.37ix.com.cnhdpeguan.37ix.com.cndutongxw.37ix.com.cn jubingxixw.37ix.com.cnsame time, baohuguan.37ix.com.cnmppguan.37ix.com.cnthe steel pipe fasteners are centralized stacked after manual delivery. No free falling is allowed to damage the ground, and the stacking place is protected by nine splints.
            (4)墻體砌筑階段,磚塊嚴禁翻斗車自由倒卸,必須經人工傳遞至集中堆放處,且堆放處鋪設九夾板。
            (4) In the stage of wall construction, the tiles are strictly forbidden to be unloaded freely by dumpers. They must be passed to the centralized storage place by hand, and nine splints are laid at the storage place.
            (5)裝飾及水電安裝用腳手架鐵扶梯底部加設塑料墊腳和板塊對已成型混凝土面進行保護。
            (5) Plastic foot pads and plates are added at the bottom of the scaffolding iron escalator for decoration and hydropower installation to protect the formed concrete surface.

            北京鼎锘恒潤建筑裝飾有限公司

            1. 電話:13313028229
            2. 網址:www.lloritans.com

            版權風電基礎鋼模具匠心廠網址:www.lloritans.com 推薦:防撞墻模板,箱式護坡模具,檢查井模板,風電基礎鋼模具

             

            人妻中字视频中文乱码_久久精品国产亚洲AV麻_久久女人爽女人爽_黑人太大太长疼死我了